Batesburg-Leesville to get new water resource, service

17 February 2022

This particular project is expected to become completed within the next 2-3 yrs. BATESBURG-LEESVILLE, S. C. — A long-term water facilities project was approved recently for residents in Batesburg-Leesville. It’s going to completely change the town’s water source. After almost a decade, a new 40-year relationship between the Joint Municipal Drinking water and Sewer Commission as well as the Town of Batesburg-Leesville is usually starting. Back in 2013, the particular SC Department of Into the Environmental Control (DHEC) released a consent order needing town leaders get a a lot more reliable water source. ASSOCIATED: Midlands police chief heading off after more than 45 yrs serving community”We’ve got to possess the infrastructure in place to be able to provide new neighborhoods with drinking water, new businesses with drinking water and sewer, ” mentioned town manager Ted Luckadoo. In the area of the Batesburg-Leesville Commercial Park is where the water transmitting line from Joint City and county Water will connect to the city. The town is in charge of connecting this particular new 10-mile long drinking water pipeline from Cheyenne Path into town, impacting regarding 3, 000 residents. Combined Municipal will pay for drinking water pumps and a new drinking water storage tank facility. ASSOCIATED: New Batesburg-Leesville head soccer coach generates a reaction”We’re going to be able to construct a brand new water transmission main from your western side of Shared Municipal’s service area towards the eastern side of Batesburg-Leesville service area, and we will low cost supply potable drinking water towards the town for its existing clients and for some growth in the future, ” said Jay Nicholson, general manger for the Mutual Municipal Water and Sewer Commission. Once everything brand new is up and running, the city will decommission its drinking water treatment plant that strained pond water into drinkable water – its primary water source. RELATED: Batesburg-Leesville plans to change business certification fees”During the peak summertime when more water has been used, that pond has started to get lower and cheaper every summer, ” Luckadoo said. The town said following the 10-month period of designs, environment assessment and surveying, it is going to get funding from nearby water and sewer product sales, and possibly through state and federal grants or loans. The new water system is likely to be fully implemented within the next two to three years.

See Your Business Here!

For more information on our listings, advertising, coupons, and mailers, please contact us today!